Done.
Sample ruleset:
manufacture:
- name: STR_AVENGER
transferTimes: [0, 0, 14]
First number is transfer time for items.
Second number is transfer time for scientists, engineers and soldiers.
Third number is transfer time for craft.
Zero means turned off (i.e. no transfer at all).
For personnel, minimum is 1 (hour).
Defaults are: items = 0, craft = 0, personnel = 24.
You don't have to specify all 3 numbers.
For example if the project only produces items, you can also just specify 1 number, example:
manufacture:
- name: STR_PISTOL
transferTimes: [7]